A light and a power point in the loft
A light makes a boarded loft far more useful. Without one, you hold a torch in one hand and a box in the other, at the top of a ladder. It's a small job, and it's best planned before the boards go down.
Your options
Who can do it, and what needs notifying
In England, electrical work in a home has to meet Part P of the building regulations.
- Adding a light or socket to an existing circuit doesn't usually need notifying to building control. It still has to be done safely, to the wiring regulations.
- A new circuit from the fuse box does need notifying. A registered electrician can certify it themselves and tell building control for you.
So a registered electrician is the simple route: they know which is which, and you get a certificate either way. See building regulations and loft boarding for the rest.
Why before the boards
Once the boards are down, the cable has to run on top of them or the boards come up. Before, the electrician can run it along the joists and clip it where it won't get trodden on or screwed into.
If you're having the loft boarded, plan the light at the same time. Tell the electrician where the boards will go and where the switch should be. Tell your boarding installer the light is coming, so they leave the cable a way through.
What it isn't
A light isn't part of the boarding price here, and we don't arrange electricians yet. When you tell us about your loft, the light is listed under "not included", so you know to plan it.