Loft boarding: DIY or a firm? An honest comparison
Some people should do this themselves. If you're handy, you're boarding a small area, and your insulation is below the tops of the joists, it's a weekend job with a drill. We'd rather tell you that than pretend otherwise.
For everything else, here's what's involved, job by job.
Job by job
| The job | DIY? | Why | Fitted here |
|---|---|---|---|
| Boards on the joists, small area, with a ladder | A fair DIY job | Boards go straight on, screwed down. The hard part is working on your knees, on the joists, with a torch | £690 |
| Raising the boards over deep insulation, small area | Harder | Every board sits on supports that have to be level and fixed to the joists, with a gap for air | +£200 |
| About half the loft, with a ladder | A long job | Dozens of boards up a stepladder through the hatch, then a day or more on your knees | £1,145 |
| A loft ladder, aluminium | Possible, with two people | A heavy box at head height, fixed to the hatch frame, cut to your ceiling height | £295 |
| A bigger hatch | Best left to a firm | Often means cutting a ceiling joist and supporting the ends. Cut a truss and you weaken the roof | +£250 |
Indicative prices, including VAT; "+" means added to the boarding price. Get an indicative price now; a local trade confirms it.
Where DIY goes wrong
The usual five, and how to avoid each:
- A foot through the ceiling. Between the joists there's only plasterboard. Kneel on a board laid across two joists, never on the insulation.
- Squashed insulation. Boards laid on insulation that's deeper than the joists squash it and stop it working. See can you board over loft insulation?
- A screw through a cable or pipe. Cables run across the joists, and some run along them. Lift them clear before each board goes down, and know where they are before each screw goes in.
- Boards over the spotlights. Spotlights set into the ceiling below get hot. Leave space around them.
- Blocked eaves. Boards and boxes pushed into the low edges of the loft block the air coming in, and that's how condensation starts. See condensation after boarding.
If you choose a firm
You'll want to compare like with like. Firms package the job differently, with or without VAT, raised or not, with or without a light. Questions to ask a loft firm puts two quotes side by side.
Or tell us about your loft. You'll see everything itemised, with an indicative price, and one local firm gets your job, checked before it does. No sales visit, and nothing to pay to order.