Getting the loft ready for the fitters
Clearing the loft is the one thing that isn't included. Boards can't go down under your boxes, so the area to be boarded needs to be empty before the fitters arrive. Everything else on this list is quick.
The evening before
1. Clear the area to be boarded
Bring down anything stored in the area you're having boarded, and anything in the way of the hatch. If you can't, ask your installer whether they can move it, for an extra charge. Don't move anything you can't lift safely down a stepladder.
2. Clear the landing
The fitters work from below the hatch: a stepladder, boards passed up, and a ladder fitted to the frame. Move anything from the floor under the hatch, and anything that could get knocked off a wall nearby.
3. Clear a path from the door
Boards come in as long, flat panels. Clear a path from the front door to the stairs and up to the hatch, and move anything fragile from the hall.
4. Cover what's below
Put a dust sheet or an old sheet over the carpet under the hatch, and close the doors of rooms nearby. If the hatch is being made bigger, take down anything precious from the walls close to it.
Before they start
- Tell them what's changed since your photos. A leak, a new cable, a wasps' nest, or things you couldn't move. Your price was confirmed from your answers and photos, so anything different matters.
- Show them the spotlights. If you have spotlights set into the ceiling below, point them out from downstairs. Boards need space left around them.
- Say where the light will go, if an electrician is fitting one. See a light and a power point in the loft.
- Point out the stopcock and the fuse box, in case they need either.
- Keep pets and children away from the landing while the hatch is open.
When they've finished
Before they leave, look at the work together. Checking a loft job has the list. Your installer takes away packaging and offcuts, which is included.